Difference between revisions of "Vital Signs New Install"
(→Install Check List) |
|||
Line 43: | Line 43: | ||
− | '''Windows | + | '''Windows''' |
* [[FTP Server Setup]] | * [[FTP Server Setup]] | ||
Line 51: | Line 51: | ||
* [[Qlikview Server]] | * [[Qlikview Server]] | ||
* vitalsigns.zip unzipped to vitalsigns directory | * vitalsigns.zip unzipped to vitalsigns directory | ||
− | |||
==Post Install Check List== | ==Post Install Check List== |
Revision as of 22:53, 13 September 2012
Overview
The Vital Signs install can be broken into 3 distinct phases; Pre Install, Install and Post Install. The following Check Lists will guide your installation of Vital Signs through these 3 phases.
The Pre Install phase encompasses gathering the information of Credit Union defined attributes and extract criteria to make data more meaningful. It also includes the information on Windows Server requirements, HPUX Server requirements and establishing with Vital Soft key contacts for the project.
The Install phase encompasses the setup of software on the HPUX and Windows servers
The Post Install phase encompasses all of the configuration for the different Applications to fine tune the product
Pre Install Check List
Provide Vital Soft with Contacts For
- Project Lead
- VPN Access
- HPUX/UC4 Installation and Setup
- Windows Server Installation and Setup
Windows Server to Host Vital Signs
Share and Loan Product Grouping
Credit Union Specific Customization
Install Check List
HPUX
- HPUX Python Install
- Python configobj module Install
- /VSJOBS symbolic link
- /ASKPLUS/vsdata/vitalsigns.ini configured with proper FTP information
Windows
- FTP Server Setup
- Python 32bit
- Pyparsing Python Module
- Qlikview Client
- Qlikview Server
- vitalsigns.zip unzipped to vitalsigns directory
Post Install Check List
- Membership Analysis Configuration Files
- Transaction Analysis Configuration Files
- Spectrum Data Change Configuration Files
- Loan Application Configuration Files