Vital Signs New Install

From Vital Soft Wiki
Revision as of 19:29, 18 September 2012 by >Jeremyb
Jump to: navigation, search

Overview

The Vital Signs install can be broken into 3 distinct phases; Pre Install, Install and Post Install. The following Check Lists will guide your installation of Vital Signs through these 3 phases.

The Pre Install phase encompasses gathering the information of Credit Union defined attributes and extract criteria to make data more meaningful. It also includes the information on Windows Server requirements, HPUX Server requirements and establishing with Vital Soft key contacts for the project.

The Install phase encompasses the setup of software on the HPUX and Windows servers

The Post Install phase encompasses all of the configuration for the different Applications to fine tune the product


Pre Install Check List

Provide Vital Soft with Contacts For

  • Project Lead
  • VPN Access
  • HPUX/UC4 Installation and Setup
  • Windows Server Installation and Setup

Windows Server to Host Vital Signs

Share and Loan Product Grouping

Credit Union Specific Customization


Install Check List

HPUX


Windows

Post Install Check List

  • Membership Analysis Configuration Files
  • Transaction Analysis Configuration Files
  • Spectrum Data Change Configuration Files
  • Loan Application Configuration Files